Showing posts with label open heart. Show all posts
Showing posts with label open heart. Show all posts
Tuesday, May 12, 2009
Showers for OHS pts
Per Peggy, OT is not required to do the first shower with our open heart pts. It is a good opportunity for the primary RN to assess the pt and begin teaching. RNs should check to make sure that all dressings are removed, PICCS/peripheral IVs are covered, and pacer wires are insulated before the shower. Any moisture at invasive sites promotes to growth of bacteria. Peggy is working on a new post-chest tube-removal dressing that would allow the patient to shower the same day as chest tub-removal. For now, pts must wait 24 hours after the tubes are removed before showering.
Subscribe to:
Posts (Atom)